Secondary Containment Coatings for Chemical Storage

A secondary containment area is not a floor with a coating on it. It is a lining, built to hold a volume of liquid for a period of time if the primary container fails, and judged by whether it would actually do that.

Treating it as a floor coating project is the most common way these areas end up not working. The specification questions are different, the materials are different, and the details that matter are at the edges rather than in the middle.

What the area is actually for

Containment exists so that a spill or a tank failure stays where it happened long enough to be dealt with, instead of reaching a drain, the ground or a watercourse. That purpose drives four requirements.

  • It has to hold liquid, which means continuous and without penetrations that leak.
  • It has to resist the specific chemistry stored there, not chemicals in general.
  • It has to hold that chemistry for a period, since a lining that resists a brief splash and softens after hours of immersion has not done the job.
  • It has to be inspectable, so that a defect can be seen before it is needed.

Whether a particular area is legally required to have containment, what volume it must hold, and how it must be inspected are matters for the regulations that apply to your operation and the authority that enforces them. The system selection described here does not answer those questions.

Chemical compatibility is the specification

This is the heart of it, and it is where generic answers are worthless. A system is selected against a list of the actual chemicals stored, at the actual concentrations, at the temperatures involved. A resin that is excellent against one acid may be poor against another, and good against a dilute solution while failing against a concentrated one.

Two further points matter. Immersion is different from splash. Many resin systems tolerate incidental contact that is cleaned up and fail under prolonged immersion. Containment is an immersion duty by definition.

Temperature changes compatibility. A chemical that a system resists at ambient temperature may attack it when hot.

The practical consequence is that the chemical list is the first document in the project, and it needs to be complete. A list that says solvents or acids is not a list.

Where containment areas fail

Almost never in the middle of the floor.

  • The wall to floor junction is the first place. That corner is where the lining has to turn ninety degrees and remain continuous, and a square corner with the material simply painted into it is a crack waiting to happen. Coved detailing with a radius is standard for the same reason it is standard in food processing.
  • Penetrations. Pipes, conduits, anchors, drains and equipment bases all pass through the lining, and each one is a detail that has to be built rather than painted around.
  • The containment wall itself, including the top edge, which is often left uncoated on the assumption that liquid never reaches it.
  • Joints in the slab, which have to be treated so the lining stays continuous across them, as discussed in expansion and control joints in coated concrete floors.
  • The access point, meaning the ramp or threshold where equipment enters, which takes traffic and is a change in geometry.

The substrate decides the outcome

A lining is bonded to the concrete and inherits its condition. Cracks are routed, filled and treated before the lining goes on, because a lining over an active crack reproduces it. The assessment process is in concrete crack repair, cosmetic versus structural.

Moisture from below has to be understood, since vapor drive affects bond and some systems tolerate it better than others. That is covered in the hidden cost of moisture under floors.

And the concrete itself has to be sound. Where a containment area has been in service with chemical exposure on bare or failed coating, the concrete may be degraded to depth, and surface repair is not enough. The restoration decision is framed in concrete slab restoration, repair, resurface or coat.

Thickness and build

Containment linings are generally built thicker than ordinary floor coatings, and sometimes reinforced. Thickness provides chemical resistance over time, since a thin film has less material to lose before the substrate is exposed, and it provides mechanical durability in an area where drums are moved and equipment is handled.

Where the substrate is cracked or movement is expected, reinforcement within the lining is used to bridge it. That is a design decision with a reason behind it, and it belongs in the specification rather than being added on site.

Inspection and maintenance

A containment lining is inspected rather than forgotten, because its value is entirely in whether it works on the day it is needed. What is looked for is blistering, cracking, discoloration or softening, which indicate chemical attack, damage at the wall junction and at penetrations, condition of the top edge of the containment wall, standing liquid that should not be there, and the condition of any sump or collection point.

A regular inspection with a record is also what demonstrates that the area has been maintained. The general maintenance discipline is in concrete floor maintenance checklist for high traffic spaces.

What belongs in the specification

The complete chemical list with concentrations and temperatures. The system selected and the compatibility data it was selected against, for immersion rather than splash. The lining thickness and whether it is reinforced. Substrate preparation, crack treatment and moisture assessment. The wall to floor junction detail with the cove radius. A schedule of every penetration and how each is detailed. The containment wall treatment, including the top edge. The access threshold detail. Cure time before the area returns to service. And the inspection regime. Our industrial work is on the commercial and heavy duty surface protection pages.

Frequently asked questions

Is a containment coating the same as a chemical resistant floor coating?

No. A chemical resistant floor is specified for incidental contact that gets cleaned up. A containment lining is specified to hold liquid for a period, which is an immersion duty, and many systems that tolerate splash fail under prolonged immersion. It is also built thicker, detailed differently at the edges, and judged by whether it would actually hold a spill.

How is the system chosen?

Against a complete list of the actual chemicals stored, at their real concentrations and temperatures, for immersion rather than splash. Compatibility is specific: a resin excellent against one acid may be poor against another, and good dilute while failing concentrated. Temperature changes it too. A list that says solvents or acids is not a list, and the project cannot be specified from it.

Where do containment areas usually fail?

At the edges rather than in the middle. The wall to floor junction is first, which is why coved detailing with a radius is standard rather than painting the material into a square corner. Then penetrations such as pipes, conduits, anchors and equipment bases, the top edge of the containment wall, joints in the slab, and the access threshold where equipment enters.

How often should containment be inspected?

Regularly and with a record, because the value of a lining is entirely in whether it works on the day it is needed. Look for blistering, cracking, discoloration or softening that indicate chemical attack, damage at the wall junction and penetrations, the condition of the containment wall top edge, standing liquid, and the state of any sump or collection point.

Who decides what volume our containment has to hold?

The regulations that apply to your operation and the authority that enforces them, not the flooring specification. The same applies to whether containment is required at all and how it must be inspected. Establish those requirements first, then specify a lining that meets them, rather than the other way round.